|
Transport and Erection of a 30t and
a 120t-Footbridge
Two
footbridges weighted 30t and 120t were built in Mainland China
and sea-freighted to a public harbour in Chek Lap Kok. The moon-shape 120t-bridge was loaded on a Goldhofer
4-axle lowbed trailer and a THP4. Manivest used their 6x6 Mercedes Benz
3853AS tractor to pull the bridge for 2 kilometers and
their Liebherr LTM1400 was set up to lift the bridge at the destination - the new headquarter of Cathay Pacific Airways.
After
the LTM1400 lifting up the 120t-bridge, the MB 3853AS and the Goldhofer
trailers were freed and this time the 30t-bridge was loaded on the
extended lowbed trailer by a Demag AC615. Roads were blocked and
the job was carried out from 1am to 7am in the morning.
¡@
 
Back
to Homepage |